E
empshott.org Empshott Grange SEN school plans · South Downs National Park
Planning Reference SDNP/24/03736/FUL SDNP/25/03084/FUL
Evidence Dossier · 2026

Is Empshott Grange a safe school location?

An evidence-based review of traffic, carriageway geometry and network resilience on the B3006, Mill Lane and Church Lane.

Download the PDF Watch the full video
Aerial view across the Empshott valley — fields, woodland and scattered dwellings in the South Downs National Park.
Empshott Grange · South Downs National Park Watch overview · empshott.org/video1
Subject
Proposed school development at Empshott Grange
Scope
Highway safety & network resilience
Material
Photographic evidence, Nov 2025 – September 2026
Scope of review

Why this matters.

This document sets out evidence on highway safety and network resilience in connection with the proposed school development at Empshott Grange. It relates to planning applications SDNP/24/03736/FUL and the subsequent SDNP/25/03084/FUL, which propose an independent specialist special educational needs (SEN) day school for up to 40 pupils aged 5–16. Our central concern is the safety of the lanes that would serve the site — roads we do not believe are suitable for the volume and pattern of traffic a school would generate.

The B3006, Mill Lane and Church Lane are narrow, largely single-track rural lanes, with blind bends, limited visibility and few usable passing places, and for much of their length no pavement at all. They are shared every day by horse riders, walkers, cyclists and children on foot, with nothing to separate them from vehicles. The photographic material that follows documents these conditions as they stand today. It shows a network that already congests at peak times, and where a single incident — a breakdown, a collision, or simply two large vehicles meeting — is enough to bring it to a complete standstill. Adding concentrated, time-pressured school traffic would make that congestion, and the total blockages that follow, a regular event rather than a rare one — intensifying the risks to residents and road users alike, within the village and on the B3006.

01
Swept-path analysis appears inconsistent with the measured road width.

At a point on Mill Lane measured at approximately 3.35 m wide, the applicant’s swept-path analysis depicts opposing vehicle movements even though the applicant’s own stated vehicle widths total 3.86 m before mirrors or clearance.

02
Have the dimensions underlying the swept-path analysis been independently checked?

Hampshire County Council Highways reviewed the applicant’s drawings, but we have found no statement confirming that the critical carriageway widths were independently measured on the ground. Given the apparent discrepancy, we ask whether the geometry was independently verified or accepted from the applicant’s submitted survey and drawings.

03
The Mill Lane / B3006 junction remains highly constrained.

Even with the proposed widening to 4.8 m, larger vehicles have extremely limited passing space at the angled junction. A blind approach, overtaking and excess speed leave drivers little time to respond, and vehicles wait up to two minutes for a gap, queueing back to the single-track lane.

04
Mill Lane is already too narrow for repeated commercial vehicle movements.

Refuse, delivery and service vehicles already struggle to pass. One routine refuse vehicle was forced off the carriageway and took more than 24 hours to be moved.

05
Additional school traffic would increase conflicts and congestion.

Hampshire County Council Highways itself records that the development would increase the likelihood of two vehicles meeting on Mill Lane. Where vehicles cannot pass, the consequences are stopping, waiting, reversing, verge overrun and obstruction — and the few passing bays are also used for parking, so when one is occupied there is nowhere to pass.

06
The local road network has very little resilience.

Previous collisions on the B3006 have caused traffic to back up through Mill Lane and Church Lane, leaving the network effectively impassable. When this happens, nobody — the school included — can get in or out.

07
Very little visibility at the Mill Lane / Church Lane junction.

All school traffic would exit here, where tree canopy, bends and gradient sharply limit how far a driver can see.

08
Vulnerable road users have little or no safe refuge.

Horse riders, walkers and cyclists share these narrow lanes with vehicles, often with no footway or safe place to move clear when traffic approaches.

A tape measure across Mill Lane recording a carriageway width of approximately 3.35 m at the swept-path location.
For comparison, a lane measured at 4.5 m — roughly the minimum width for a Ford Transit (about 2.47 m with mirrors) and a car (about 2.02 m with mirrors) to pass.
Annotated analysis of the Mill Lane / B3006 swept-path drawing: the lane is marked at 3.35 m across, while the applicant's design vehicles combine to 3.86 m before mirrors and about 4.5 m including mirrors — well below the width needed to pass.
Mill Lane · Measured carriageway width

Applicant's swept-path analysis depicts simultaneous passing at a 3.35 m pinch point

The photographs above record the measured carriageway width of approximately 3.35 m at this point on Mill Lane, alongside the roughly 4.5 m that two vehicles would actually need to pass. This is the same point through which the applicant's swept-path analysis depicts two opposing vehicle movements.

The applicant's own stated vehicle widths are 2.06 m for the L3 H3 Ford Transit and 1.80 m for the SDV, giving a combined body width of 3.86 m, excluding mirrors (Additional Highways Plans, SDNP/25/03084/FUL).

The combined stated body width therefore exceeds the measured carriageway width by approximately 0.51 m before any allowance is made for wing mirrors, clearance between the vehicles, or clearance from the edges of the carriageway. In practical terms, the discrepancy would be greater once mirrors and even a minimal passing gap were taken into account.

This raises an important question as to how the simultaneous swept paths shown on drawing TR/06 can be reconciled with the physical dimensions of the highway at this location.

This is particularly relevant because Hampshire County Council Highways expressly refers to TR/06 in its substantive consultation response and states that the drawings show a minibus and car, and two minibuses, passing simultaneously along Church Lane. Although the measured pinch point is on Mill Lane immediately beyond the Church Lane junction, the swept paths shown on TR/06 continue through the junction and across this location.

Hampshire County Council Highways also records that, with the proposed development, traffic on Mill Lane would increase to approximately one two-way vehicle movement every 90 seconds during the AM and PM school peak periods, and specifically acknowledges that this “increases the risk of two vehicles meeting along Mill Lane”.

If two vehicles meet at this 3.35 m pinch point, the applicant's own dimensions indicate that they cannot simply pass one another. One vehicle would have to stop, wait, reverse or find a wider location. With substantially increased movements concentrated into the school arrival and departure periods, this creates a clear risk of recurring vehicle conflict and localised queuing close to the Church Lane/Mill Lane junction.

Are Hampshire County Council Highways aware that simultaneous passing at this specific point appears to be physically impossible, despite the submitted swept-path analysis depicting opposing vehicle movements through it? If so, has the operational consequence of vehicles having to stop, wait or reverse at this pinch point been specifically assessed when considering the proposed increase in school traffic?

Two Land Rover Discovery Sports side by side at the Mill Lane pinch point, looking north away from Empshott Grange, each pressed against the hedge on its side of the lane.
Looking north, away from Empshott Grange
The same two vehicles seen from the other direction, looking south towards Empshott Grange, with wheels up on the banks either side of the lane.
Looking south, towards Empshott Grange
Mill Lane · The 3.35 m pinch point

Two cars only fit side by side here by driving up the banks

These photographs show two Land Rover Discovery Sports stopped side by side at the 3.35 m pinch point shown on the applicant’s swept-path drawing. The first looks north, away from Empshott Grange; the second looks south, towards it.

Each vehicle is about 1.90 m wide without mirrors and 2.17 m with them, so together they need 3.80 m before mirrors are counted, more than the 3.35 m available. The only way to place them side by side was to drive each one up onto the bank on its side of the lane, against the hedge. On the lane itself, there is no room for them to pass.

Each Discovery Sport is slightly wider than the applicant’s 1.80 m design car, but together the pair is narrower than the Ford Transit and car shown passing in the applicant’s drawing: 3.80 m against 3.86 m without mirrors, and 4.34 m against about 4.50 m with mirrors.

They could only be positioned here because their high ground clearance let them climb the banks, something an ordinary car or a Transit van would struggle to do.

Regular passing of this kind would also wear away the verge and hedgerow bank on the eastern side, the same features the applicant’s Preliminary Ecological Appraisal commits to retaining “unaffected”.

At night, 18 November 2025: a queue of cars with brake lights illuminated, backed up after a collision on the B3006.
B3006 · 18 November 2025

The school is likely to be inaccessible several times a year

On the evening of 18 November 2025 a collision on the B3006 caused queues to back up into the adjoining lanes, and traffic across Empshott — Mill Lane and Church Lane included — ground to a halt. With no viable alternative route, a single incident on the main road renders the surrounding network effectively impassable. In those conditions access for emergency vehicles would be severely constrained. Incidents like this occur several times a year, and when they do, parents and children may be unable either to reach the school or to leave it. This is the network into which school-generated traffic would be added.

Watch footage · empshott.org/video3
Night CCTV on Church Lane, 06:50 on 3 February 2026: a van and a car meeting head-on on a narrow lane with no room to pass.
Church Lane · 3 February 2026

Nobody can get in or out of the village

Following a collision on the B3006, traffic was diverted onto Church Lane — a lane that cannot carry two-way flow. The diverted two-way traffic met head-on with nowhere to pass, and the result was gridlock (recorded here at 06:50). Each time the main road fails, the village lanes inherit traffic they were never built to take.

Watch footage · empshott.org/video7
Church Lane, 20 October 2024: cars left inside a private farm barn beside hay bales after a crash on the B3006, when residents were unable to enter or leave the village.
Church Lane · 20 October 2024

A crash on the B3006 blocks the village

On 20 October 2024, a crash on the B3006 sent traffic onto Church Lane. With nowhere to pass or turn, drivers abandoned their vehicles on private property, and residents were unable to enter or leave the village. The same pattern was recorded again on 3 February 2026: when the main road is blocked, the village is cut off.

A scaled swept-path demonstration over the site survey: three BMW X5 cars queued on Mill Lane waiting to turn onto the B3006 while an 11.2-metre refuse collection vehicle turns in from the B3006, on a 4.8-metre carriageway, showing very tight clearance between the vehicles.
Mill Lane / B3006 junction · Carriageway width 4.8 m

At the proposed 4.8 m width, large vehicles may still be unable to pass safely at the angled junction

A 2014 BMW X5 is approximately 1.938 m wide excluding mirrors, while the applicant's refuse vehicle is stated as 2.53 m wide. On those body-width dimensions alone, the two vehicles would occupy 4.468 m of the proposed 4.8 m carriageway, leaving only 0.33 m of theoretical total remaining width — before allowing for mirrors or any practical driving clearance.

Including mirrors, the margin becomes smaller still. The X5 is approximately 2.184 m mirror-to-mirror. If the refuse vehicle's actual mirror-to-mirror width is approximately 2.9 m, their combined width would be about 5.084 m, exceeding the proposed carriageway width by approximately 0.28 m.

The proposed widening to 4.8 m is intended to improve two-way movement at the junction. However, Hampshire County Council Highways itself acknowledges that with larger vehicles there are circumstances where passing a car is unachievable within the highway constraints.

This is particularly important because the approach from the south on the B3006 is heavily restricted by the geometry of the junction. In the filmed example, an approaching vehicle becomes visible to a vehicle waiting to emerge only around 0.75 seconds before the potential conflict point. If either vehicle is slightly out of position, there is therefore very little time to recognise the conflict and correct its position.

An entering HGV or refuse vehicle may consequently have to brake, stop or manoeuvre extremely cautiously before it can clear the B3006. The concern is therefore that, even after widening to 4.8 m, the combination of a large vehicle, an exiting car, minimal lateral clearance and very limited reaction time may still create a significant conflict at the junction.

The B3006 approaching the Mill Lane junction from the south: the junction is hidden behind a building and hedgerow, shown by a red visibility overlay. Drivers turning in can meet opposing traffic suddenly, with very little time to react.
B3006 · Approaching the Mill Lane junction

Limited visibility approaching the Mill Lane junction

Approaching the Mill Lane junction from the south, visibility is effectively blind until the last moment. Even with the proposed widening, drivers may have very little time to see and react to vehicles entering or leaving the junction.

Video: a heavy goods vehicle turning from the B3006 into Mill Lane, filmed September 2026.
Mill Lane / B3006 junction · September 2026

HGVs must turn several times just to enter Mill Lane

Filmed in September 2026, this clip shows a heavy goods vehicle turning off the B3006 into Mill Lane. The junction is so tight that the HGV cannot complete the turn in one movement — it has to shunt back and forth, making several turns to line itself up with the lane, holding up traffic on the B3006 as it does so.

The proposed widening of the junction would help with this — but only when the lane is clear. With vehicles queued on Mill Lane waiting to exit, as they would be at a school's peak times, the room to complete the turn is lost and the obstruction returns.

Watch the September 2026 clip · empshott.org/video17
Dashcam still, 11 June 2026, at the Mill Lane / B3006 junction: a vehicle emerging from Mill Lane as an oncoming van appears from the right; the on-screen timer reads 00:00.43.
Mill Lane / B3006 junction · 11 June 2026

Limited warning and minimal passing clearance at the widened B3006 junction

This clip illustrates the limited warning available to a vehicle waiting to leave Mill Lane when another vehicle turns in from the B3006. Although the proposal widens the approach to 4.8 metres, widening the carriageway does not remove the underlying conflict at the junction.

A vehicle approaching from the south on the B3006 can begin turning into Mill Lane before it becomes clearly visible to traffic waiting to emerge. In the filmed example, the interval from first sight of the approaching van to the potential conflict point is approximately 0.75 seconds.

The available passing margin is also very small. A 2014 BMW X5 is approximately 2.184 m wide including mirrors. Two X5s travelling in opposite directions would therefore occupy 4.368 m of a 4.8 m carriageway, leaving only 0.43 m of theoretical total clearance — around 0.22 m per vehicle if both were perfectly positioned.

The significance of this limited clearance is increased by the restricted warning available at the junction. If either vehicle is even slightly out of position, there is very little opportunity for either driver to correct their lateral position before the vehicles meet. A vehicle turning left into Mill Lane can appear at the conflict point extremely quickly, while a vehicle waiting to emerge may already be committed to its position on the widened section.

With such limited time and lateral margin, even a relatively small positioning error could result in abrupt braking, an avoidance manoeuvre, or a collision. The concern is greater where an HGV, refuse vehicle or other large vehicle is involved, particularly where the entering vehicle is also seeking to clear the B3006 promptly.

Any hesitation, obstruction or failed passing manoeuvre could also cause traffic to slow or queue on the B3006 itself.

Watch the clip · empshott.org/video18
Aerial of the Mill Lane / B3006 junction, 25 November 2025: a car waiting to turn right onto the B3006, with an on-screen timer showing around twenty seconds elapsed.
Mill Lane / B3006 junction · 25 November 2025

Long waits and queueing remain despite the widening

Widening the first approximately 60 metres of Mill Lane does nothing to reduce the time vehicles must wait for a safe gap in fast-moving B3006 traffic. In the footage — real traffic on the B3006 — the superimposed vehicle would have had to wait around two minutes for a safe gap to turn right. As vehicles accumulate, the queue simply extends back along the widened section until it reaches the point where Mill Lane narrows again to single track.

Using a 2014 BMW X5 as a reference vehicle at 4.886 m long, and allowing roughly 1 metre between cars, only about 10 vehicles would fit within a 60 m section before the queue reached the single-track lane. At that point, vehicles trying to travel in the opposite direction would meet a stationary queue with nowhere to pass except the existing passing places, creating the potential for severe obstruction or gridlock.

This problem exists regardless of the proposed widening, because the fundamental constraint is the availability of safe gaps in the B3006 traffic. The applicant's Road Safety Audit recorded approximately 730 vehicles per hour on the B3006 during the observed periods, confirming that this is already a heavily trafficked junction.

Watch footage · empshott.org/video9
Aerial of the B3006 near the Mill Lane junction: a motorcycle and a car on the open road in a national speed limit stretch.
B3006, Mill Lane junction · Real footage

Overtaking and excess speed at the junction

On the B3006 approach to the Mill Lane junction, vehicles frequently overtake and regularly exceed the speed limit, with local residents reporting speeds well above it. They accelerate hard in anticipation of the national speed limit on the unrestricted road just beyond the junction — so traffic is gathering speed at exactly the point where turning vehicles must pull out. A new junction generating regular turning movements — parents unfamiliar with the road, slow-moving coaches — would introduce repeated conflict with that fast through-traffic. Under pressure from fast approaching vehicles and mounting delay, drivers waiting to turn are drawn into poor gap acceptance — accepting marginal gaps and making risky decisions — and at these speeds there is little margin for error. By any reasonable measure, it is a dangerous junction.

Watch footage · empshott.org/video11
A car and a horse rider meeting on the narrow lane beside the stone gateposts at the proposed entrance, with an official horse-rider warning sign shown alongside.
Mill Lane / Church Lane · 8 May 2026

Vulnerable road users have no safe refuge

Horse riders, walkers and cyclists may be able to avoid the main school drop-off and collection periods, but they cannot plan around couriers, food deliveries, maintenance vehicles, waste collections, servicing and other traffic arriving unpredictably throughout the day.

The footage demonstrates the problem directly: the approaching car has to stop because there is insufficient room to pass the horse safely. Neither the horse and rider nor the vehicle has a proper refuge; beyond occasional gateways or passing places, the alternatives are essentially the verge, hedge or carriageway itself. This creates an inherently constrained and potentially hazardous situation.

Additional unpredictable traffic throughout the day would increase the frequency of these encounters, affecting horse riders, walkers, cyclists and other vehicles travelling in either direction, not simply during school drop-off and collection periods.

Watch the clip · empshott.org/video19
The evidence

What the lanes already show.

Each exhibit below was recorded on routes that would directly serve the proposed school. None involved school traffic. They illustrate the network in its present, baseline condition.

Mill Lane: a narrow single-track lane between high hedgerows with an oncoming car ahead, viewed through a vehicle windscreen.
Mill Lane · Insufficient carriageway width

The access route cannot carry two-way traffic

Mill Lane — the principal access route to the site — does not support two-lane traffic. A single-track lane, it has insufficient width for two vehicles to pass at peak demand; where vehicles meet, one must yield to the verge or reverse to a wider point. The footage shows that even minor increases in traffic cause immediate congestion, and that multiple vehicles arriving simultaneously cause obstruction. Concentrated school-hour movements would force this repeatedly, at the busiest times of day.

Watch footage · empshott.org/video2
A tipper lorry on Mill Lane between Empshott Grange and the B3006, filling the lane from verge to verge between high hedges.
Mill Lane · 27 September 2026

A single lorry fills Mill Lane

Between Empshott Grange and the B3006, a tipper lorry fills Mill Lane from verge to verge.

One car can wait in a lay-by. Two vehicles meeting it can block the lane completely.

There is no room for vehicles to pass, and little or no refuge for walkers, cyclists or horse riders.

Mill Lane, 9 February 2026: a white Veolia refuse lorry tilted with its nearside wheels off the carriageway, giving way to oncoming traffic on a narrow hedged lane.
Mill Lane · 9 February 2026

Mill Lane is too narrow for repeated commercial vehicle movements

On Mill Lane, around 200 metres south of Empshott Grange, a Veolia refuse vehicle — a routine scheduled service movement — was forced to leave the carriageway entirely to allow oncoming traffic to pass. Once off the carriageway, the vehicle could not simply continue its journey and took more than 24 hours to be moved.

This is not an unusual or exceptional vehicle. It demonstrates the practical difficulty of accommodating ordinary commercial traffic on a lane of this width. Refuse vehicles, delivery vehicles, service vans, maintenance vehicles and other larger vehicles cannot always pass opposing traffic within the carriageway and may have to stop, reverse, mount the verge or wait for another vehicle to clear.

The proposed school would introduce additional daily traffic alongside these existing commercial movements. Deliveries, servicing, waste collection, contractors and larger school-related vehicles would all need to use the same constrained road network, often at the same times as staff, parents and other traffic.

The concern is therefore not simply whether an individual large vehicle can physically travel along Mill Lane. It is whether these narrow rural lanes can safely and reliably accommodate repeated commercial and school-related vehicle movements alongside increased two-way traffic, without recurring conflict, verge overrunning, reversing, obstruction — or vehicles becoming immobilised for extended periods.

The junction at the proposed school entrance, 10 February 2026: a police 'SLOW' board and traffic cones in the lane, with a fingerpost to Empshott Green, Hawkley and Selborne.
Proposed school entrance · 10 February 2026

When the road is blocked, there is nowhere to clear to

This is the junction that would serve the proposed school entrance. The carriageway here is bounded by hedge-bank and verge with little usable margin to either side: the roadside offers minimal recovery space, with almost nowhere to pull a stricken vehicle clear of the running lane. When the refuse vehicle seen in the previous exhibit had to be recovered, the operation took over 24 hours — police traffic management was needed at this very junction, and for that time the way past the proposed entrance was obstructed. An obstruction, breakdown or recovery at this point is not absorbed by the road; it closes it for as long as the vehicle remains.

Mill Lane, 24 February 2026: a dark SUV with its front wheels off the carriageway against the verge, a recovery vehicle waiting behind on the narrow lane.
Mill Lane · 24 February 2026

A further vehicle leaves the carriageway at the same point

On 24 February 2026 another vehicle left the carriageway at the same constrained point on Mill Lane, again requiring recovery (the recovery vehicle is visible behind). A spot where ordinary vehicles repeatedly run off the surface is not one that can safely absorb concentrated, time-pressured school traffic.

Watch footage · empshott.org/video6
Driver's-eye view down a steep, tree-canopied stretch of Mill Lane with bright light and limited visibility ahead.
Mill Lane · Stopping sight distance

Is there enough time to stop?

This is Mill Lane heading north towards the Church Lane junction — the point at which every vehicle leaving the proposed school would pull out. Along the approach, tree canopy, bends and gradient limit how far ahead a driver can see, and therefore how much time there is to stop. On a lane shared with walkers, riders and oncoming traffic, that margin is the difference between a near-miss and a collision — and it would be tested by concentrated school traffic at every drop-off and collection.

Watch footage · empshott.org/video8
Driver's-eye view of Church Lane: a van approaching head-on on a single-track lane enclosed by high hedges, with no passing room.
Church Lane

Three vehicles bring Church Lane to a standstill

Church Lane is narrower still. Its use is discouraged, but nothing prevents drivers from taking it — and it takes only three vehicles meeting to bring it to a complete standstill, with reversing the only way out. School traffic seeking to avoid the main junction would inevitably find its way here.

Watch footage · empshott.org/video12
Foggy aerial of the B3006 on 3 February 2026: a long line of cars nose-to-tail along the rural road at peak time.
B3006 · 3 February 2026

A road already carrying far more than it was built for

The B3006 is a rural B-road now carrying heavy commuter flows: traffic has risen by more than 1,000% since the early 1990s, taking it beyond the capacity it was designed for. At peak times it queues; on the morning of 3 February 2026 traffic stood nose-to-tail along its length. Adding a new traffic generator to a road already beyond its design capacity compounds a problem the network cannot absorb.

Watch footage · empshott.org/video13
A navigation app on 24 February 2026 showing an accident closure on the B3006 / Selborne Road, with traffic routed onto a 16-minute diversion through East and West Worldham.
An East Hants Police witness appeal dated 2 March 2026 about a serious collision on the B3006 Selborne Road on 25 February 2026, in which a vehicle left the carriageway and struck a tree.
B3006 & connecting roads · February–March 2026

A network already at breaking point

Road closures caused by collisions on the B3006 and its connecting roads are becoming a common occurrence. On 24 February 2026 an accident closed the route, diverting traffic onto a long detour through the surrounding villages — a network with so little resilience that one incident displaces traffic across the whole area.

The danger is not theoretical. The very next day, 25 February 2026, a vehicle left the carriageway on the B3006 Selborne Road and collided with a tree, leaving the driver seriously injured; East Hants Police issued a public appeal for witnesses and dashcam footage. This is the road as it already is — before a single school vehicle is added to it.

Foggy aerial of the village on 3 February 2026: dwellings along Mill Lane with traffic on the approach road beyond.
Mill Lane & the village · 3 February 2026

Incidents push diverted traffic through the village

When accidents occur on the B3006, motorists often divert through the village along Mill Lane and the connecting lanes — routes with no pavements, shared with residents on foot. Past incidents already show how quickly that extra traffic overwhelms the village network. The concern is that a school would make the exceptional routine: more traffic, and the incidents that come with it, would mean more frequent diversions — until the congestion seen today only during an incident becomes a daily, peak-time condition, with people on foot exposed each time.

Watch footage · empshott.org/video14
Driver's-eye view of Mill Lane at low sun: a large yellow box van squeezing past, illustrating how little width the lane offers.
Mill Lane

Passing bays present, but too small for peak flow

Mill Lane does have passing bays — but they are few and small, sized for the occasional meeting rather than the steady two-way flow a school peak would create. They only function if kept clear, and some are also used for parking, which takes them out of use altogether. A van or coach cannot fit them in any case, so larger vehicles still force oncoming traffic to stop, reverse, or mount the verge. The simultaneous arrival of three or four vehicles — routine at a school drop-off or collection — is likely to bring the lane to full obstruction.

Watch footage · empshott.org/video15
Documented constraints

Eight structural limitations.

The photographic material as a whole evidences eight operational constraints on the existing network. None depends on a single hazard — together they describe a system already operating at its limit.

i
Restricted carriageway widthGeometry of Mill Lane and Church Lane is below standard for two-way movement at peak demand.
ii
Limited passing provisionNo formal passing places; informal provision depends on verges and resident frontages.
iii
Service vehicles leaving the carriagewayRoutine service movements already overrun the carriageway edge under existing demand.
iv
Junction delay & queue accumulationB3006 junctions exhibit recurring queue formation independent of incidents.
v
Network vulnerability under incidentsA single disruption renders the surrounding lanes effectively impassable.
vi
Limited capacity for additional trafficThe network has no spare capacity to absorb school-generated peak movements safely.
vii
Conflict with vulnerable usersLanes are shared with horse riders, walkers and cyclists with no dedicated provision.
viii
Constrained emergency accessThe proposed entrance geometry would severely limit fire and ambulance access under peak conditions.
Conclusion

A question of cumulative impact.

A school at Empshott Grange would not introduce these conditions — it would intensify them.

The evidence does not depend on a single hazard. It depends on the cumulative effect of restricted geometry, limited resilience and a network that already exhibits operational stress under normal conditions.

The peak-hour movements associated with a school operation — drop-off, collection, staff arrival, deliveries and coach access — would coincide precisely with the periods at which the existing network is least able to absorb additional demand.

The fundamental question is not whether mitigation is possible at the entrance itself, but whether the surrounding network — Mill Lane, Church Lane and the B3006 — can safely carry school-generation traffic on top of its existing load. The documented evidence indicates that it cannot.

A permanent public archive

A matter of public record.

This dossier and its supporting footage are published at empshott.org as a record of the conditions on these lanes at the time the decision is taken, and will remain available to anyone who wishes to understand how the network was operating.

We do not present this evidence to obstruct. We present it because the residents of Empshott share with the planning authority a care for the people who use these roads — children, riders, walkers, drivers, and the emergency services they may one day depend on.

We have set it out openly and in good faith. Our hope is simply that, whatever is decided, it is decided with a clear and shared picture of how these lanes work today.

Published and kept at empshott.org
About the village

Empshott, a village since Domesday.

Empshott is a small village in East Hampshire, within the South Downs National Park, about three and a half miles south-west of Bordon. It was once a parish in its own right; in 1931 it had 171 residents, and the following year it was merged into the parish of Hawkley.

The village appears in the Domesday survey of 1086. Before the Norman Conquest its land belonged to Bondi the Constable and Saxi of Clatford; by 1086 it was held by Geoffrey the Marshal, and the settlement consisted of four villagers and a mill.

The Church of the Holy Rood on Church Lane dates from the 13th century, with a bell-turret added in Victorian times. The River Rother has its source in the village, and to the west the land climbs steeply into the wooded scarp of the East Hampshire Hangars. John Small, one of the celebrated batsmen of the Hambledon Club, was born here in 1737.

The lanes that serve Empshott grew up around a small farming community. That history is part of why they are so narrow today.

Sources: Open Domesday; A Vision of Britain through Time; Pevsner & Lloyd, The Buildings of England: Hampshire and the Isle of Wight (1967).